The City of Minnetonka will install a secondary forcemain (pressure sewer pipe) along Minnetonka Boulevard and Minnetonka Drive in 2018 and 2019. The project runs east along Minnetonka Drive from Williston Road to Elm Lane, and continues east along Minnetonka Boulevard from Elm Lane to Guilliams Field. View a detailed map of the project area.
The project began in April 2018 and was completed by late fall except for one area (Minnetonka Drive from Williston Road to Park Valley Road) that will be finished in 2019. Large boulders were discovered in several areas, which required a new installation strategy.
Project background
The addition of a secondary sewer forcemain will allow for waste flow to be diverted to a secondary pipe during needed maintenance on the original forcemain, and it will also improve safety and ensure the flow of waste in the event of an emergency.
Project updates
Installation process
Crews will use directional drilling to install the secondary pipe along the route of the existing forcemain throughout most of the project area. The final stretch of Minnetonka Drive will require open-cut drilling.
What to expect and project impacts
- There will not be any disruptions to sewer service.
- The project may not require full road closures of Minnetonka Boulevard, and will not impact trail use or access. The final phase will require full closure of Minnetonka Drive. See project updates for more information.
- There will be construction in the right-of-way and temporary lane closures and shifts. Please plan accordingly for delays.
- Work will be conducted during business hours, Monday-Friday.
- Residents will see construction equipment, signs and barricades along the road, but access will be maintained.